MultiMatts and Elite GSS work together to get the job done
Location: Chilmington, Kent
Timeline: Hire for 10 weeks (during 2025 Summer time)
Product(s): 500+ E-Mats Heavy Duty Doubled Sided Access Mats
Team(s): MultiMatts, Elite GSS
During the summer, MultiMatts and Elite GSS (part of the Elite Group of companies) worked together to help with a valued client and their project. They contacted us in need of a temporary track which spanned the entire length of their site, leading to a large quantity of matting required. Further to this, the ground was uneven, sensitive and damaged due to the plant already driving over the area.
The client wanted the route to be wide enough for large plant and machinery, while being able to support the weight effectively. The ground was already dusty due to the weather being dry, so a strong grip was needed to reduce the vehicles’ skidding. The client wanted the matting professional installation, and that’s where Elite GSS stepped in.
Firstly, to meet the requirements of the customer, we supply our E-Mats due to their dual-sided grip and 80-tonne load-bearing surface. They are efficiently connected by 2/4 way connectors to make a wide route for plant and machinery. The Elite GSS team installed the matting for us while our team was busy on a different project, showing the benefit of our companies working within a group, always striving for the best experience for our customers!


Objectives
- High-grip surface
- Wide trackway route
- Provide support across uneven and dusty ground
Installation
The Matting was installed by our team at Elite GSS using our 4-Way Connectors, ensuring a strong and stable connection when supporting heavy-duty plant and machinery.
Benefits
- Fast and easy installation
- Minimises ground damage
- Reduces health & safety risks
- Support heavy loads
Comments
The E-Mats were ideal for this site, given the ground conditions and load requirements; the matting handled it with no problem. Made a real difference on site!
Site Manager, Chilmington site
Conclusion
The site opted for professional installation of the matting, ensuring it was correctly connected for optimal performance throughout the project. This also helped avoid downtime that can result from inexperience during installation.