Temporary access for plant and machinery in 48 sites
Customer: Erdinger Moos
Location: 48 gas and water stations
Timeline: Hire for 4 months (during 2025 Spring time)
Product: 200+ K-Mat Heavy Duty Roadway Panels
Team: MultiMatts
We were contacted to provide a temporary access solution for restoration works across 48 gas and water stations, where heavy plant and machinery needed reliable ground support. In many cases, the equipment had to pass over underground pipelines, requiring a solution that could effectively disperse weight and prevent damage.
We supplied K-Mat Heavy Duty Roadway Panels, which were used to construct multiple robust temporary roadways, to meet their needs. Over the course of four months, the panels were installed and de-installed several times as work progressed across all sites.
The K-Mats delivered excellent ground protection and ensured safe, efficient access for all machinery, while safeguarding the integrity of the underground infrastructure.


Objectives
- Temporary access for plant and machinery
- Protect pipelines and prevent damage
Installation
The K-Mats were installed and deinstalled throughout the project by our expert team. Metal Straps for K-Mats were used to ensure a secure and repeatable connection each time.
Benefits
- Simple trackway design for easy installation and deployment
- Lower transport costs
- 160 Tonne weight loading capacity
- Effectively protects the ground underneath
Comments
The K-Mats gave us exactly what we needed—strong, reliable access over sensitive ground. They made a big difference in keeping the project moving safely across all 48 sites.
Project Manager, Erdinger Moos
Conclusion
By using our installation service, Erdinger Moos ensured a secure and effective connection every time. Additionally, our deinstallation service meant they didn’t have to manage the removal process themselves.